MATERIALS |
|
Course Resources: |
|
Planned
Instructor schedule for the term. |
|
Description of the IEEM
Senior Design Process. |
|
Schedule and list of topics
from Fall 2011. |
|
Design & Maintenance of
the notebook. |
|
Meeting expectations for the course. |
|
Progress report structure and content description. |
|
Spreadsheet for tracking team budgets. |
|
Link to SDSMT Check Request Form. |
|
Design Concept Scheduling |
Not yet available
for Fall 2015. |
Outline of sections for the Project Proposal. |
|
Overview of Conceptual Design deliverables. |
|
Planning document for Spring Design Fair requirements. |
|
Poster template requirements for IEEM Projects. |
|
Poster Template for IEEM Projects. |
|
Overview of Final Design deliverables. |
|
|
|
Project Descriptions: |
|
Developing a 3-D printing workstation and multi-filament feeding system. |
|
Develop a sustainable CNC router kit & supply chain for multi-cultural implementation. |
|
Developing
a compact, relocatable CNC vertical mill workstation & work holding
system. |
|
Developing a compact, relocatable CNC turning workstation
& pneumatic ctrl system. |
|
Developing an integrated CNC router bank & pallet conveyor system. |
|
Completion of BHW
electrically-actuated height/tilt adjustment for Suzy Kappa easels. |
|
Other options for senior design projects |
|
Projects Started Fall 2014 / Spring 2015 |
|
|
|
|
|
|
|
|
|
Developing
a rapid response casting system using 3-D printing technologies. |
|
Other options for senior design projects |
|
Projects Started Fall 2013 / Spring 2014 |
|
Midcontinent Communications Supply Chain Network |
|
Automated Conduit Bender Improvement Assessment |
|
BHW Table/Workstation Height Adjustment Retrofit
Kit |
|
BHW Restricted Medicine/Food Access Project |
|
BHW Wheelchair Shopping Cart Design Project |
|
USA Science and Engineering Festival Booth Project |
|
Orthotic Device Preliminary Design &
Development Project |
|
Other, Multi-Disciplinary Project Proposals* |
|
Projects Started Fall 2012 / Spring 2013 |
|
Frozen hop processing trailer (Spring 2013) |
|
MIL Lab milling workstation design (Spring 2013) |
|
MIL Lab computer workstation design (Spring 2013) |
|
MIL Lab lathe workstation design (Spring 2013) |
|
MIL Lab laser engraver workstation design (Spring
2013) |
|
SDSMT/FuelAde production
data system (Spring 2013) |
|
IIE Regional Conference design (Spring 2013) |
|
Projects Started Fall 2011 / Spring 2012 |
|
*Design/documentation of pedal powered machines
(Fall 2012) |
|
Frozen hop process improvement of home/micro brew (Fall 12) |
|
Frozen hop business model for home/micro brew (Fall 2012) |
|
*Hardrocker project
management & business model (Fall 2012) |
|
* Start-up business plan & production model
(Fall 2012) |
|
MIL Lab milling workstation design (Fall 2012) |
|
MIL Lab computer workstation design (Fall 2012) |
|
MIL Lab lathe workstation design (Fall 2012) |
|
MIL Lab laser engraver workstation design (Fall
2012) |
|
* CAMP & other projects for Fall 2012. |
|
Production, inventory control, visual management
(Fall 2012) |
|
Production and Inventory Control Project (Spring
2012) |
|
Space Utilization Data Gathering and Database
(Spring 2012) |
|
Repositionable ADA Compliant Workstation (Spring
2012). |
|
SDSM&T
Laboratory Equipment Costing System (Spring 2012) |
|
IIE Regional Distance Design & Prototype
Project (Spring 2012) |
|
PurePak
Purification System |
Water Purification Redesign for Manufacturing
(Spring 2012) |
Potential value-stream mapping project (Spring
2012) |
|
CAMP & other projects for Spring 2012. |
|
ADA Sm Bus Guide |
U.S. Americans with Disabilities Act Small Business Guide |
Projects Started Fall 2010 / Spring 2011 |
|
Potential value-stream mapping project (Fall 2011) |
|
Repositionable ADA Compliant Workstation (Fall
2011) |
|
Biometric Lab Equipment Access Interface (Fall
2011) |
|
Transportation Logistics for 30 year Master Plan
(Fall 2011) |
|
Production Process Planning Project (Fall 2011) |
|
Production and Inventory Control Project (Fall
2011) |
|
ISO 9001 Process Mapping Project (Fall 2011) |
|
Space Utilization Data Gathering and Database
(Fall 2011) |
|
PurePak
Purification System |
Water Purification Redesign for Manufacturing
(Fall 2011) |
CAMP & other projects for Fall 2011. |
|
MILL Lab Workstations |
Repositionable
workstation prototype for MILL (started Su 2011) |
WTB Injection Molding |
WTB project follow through (started Fall 2010,
finish Fall 2011). |
SDSM&T Shuttle Service |
Simio project follow through (started
Spring 2011, finish Fall 2011). |
PBM – SQC S/W interface |
PBM project follow through (started Fall 2009,
finish Fall 2011). |